This paper investigates the prediction reliability of the transport system models, through a before and after study, taking advantage of the opening of a new part of a Neapolitan subway in December 2002. Moreover a new procedure for the OD demand vector updating is proposed able to identify possible macro mistakes in the supply/assignment model. The paper is divided into three sections; in the first the methodology is presented; in the second the results of a before and after application are described; in the third conclusions of the study are reported.
Prediction reliability of the transport simulation models: a before and after study in Naples
CASCETTA, ENNIO;
2005-01-01
Abstract
This paper investigates the prediction reliability of the transport system models, through a before and after study, taking advantage of the opening of a new part of a Neapolitan subway in December 2002. Moreover a new procedure for the OD demand vector updating is proposed able to identify possible macro mistakes in the supply/assignment model. The paper is divided into three sections; in the first the methodology is presented; in the second the results of a before and after application are described; in the third conclusions of the study are reported.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.