While planning a double-hole road tunnel with a length higher than one km, it is important to pay attention to the safety factor if an accident occurs. If there is a power outage, in order to avoid critical situations that could jeopardize the safety of the people present (facilitating the stream coming out from the tunnel and the arrival of the emergency personnel), it is really important to guarantee uninterrupted lighting of roadways, mandatory emergency lay-bys, and ways of escape. Uninterrupted service of the lighting systems supply must be guaranteed, in accordance with the current regulations, through the exertion of UPS (Uninterruptible Power Supply) and power units. During tunnel construction, such devices represent a cost that must be amortized. In this case study, which takes into consideration a section of a road tunnel characterized by emergency lay-bys and ways of escape, emergency and security lighting were planned and installation and management costs were evaluated. The goal of this research was the creation of a cash flow thanks to the energy generated by photovoltaic panels, in a way that the service life of the system (25 years) coincided with the amortization of the costs of the backup electrical equipment installation (complying with the regulations). The possibility of over-dimensioning the UPS and providing it with a proper photovoltaic panel surface (235 kWp) to generate and exchange electric energy with the grid was taken into consideration.

Case study on economic return on investments for safety and emergency lighting in road tunnels

DE LIETO VOLLARO, EMANUELE;
2015-01-01

Abstract

While planning a double-hole road tunnel with a length higher than one km, it is important to pay attention to the safety factor if an accident occurs. If there is a power outage, in order to avoid critical situations that could jeopardize the safety of the people present (facilitating the stream coming out from the tunnel and the arrival of the emergency personnel), it is really important to guarantee uninterrupted lighting of roadways, mandatory emergency lay-bys, and ways of escape. Uninterrupted service of the lighting systems supply must be guaranteed, in accordance with the current regulations, through the exertion of UPS (Uninterruptible Power Supply) and power units. During tunnel construction, such devices represent a cost that must be amortized. In this case study, which takes into consideration a section of a road tunnel characterized by emergency lay-bys and ways of escape, emergency and security lighting were planned and installation and management costs were evaluated. The goal of this research was the creation of a cash flow thanks to the energy generated by photovoltaic panels, in a way that the service life of the system (25 years) coincided with the amortization of the costs of the backup electrical equipment installation (complying with the regulations). The possibility of over-dimensioning the UPS and providing it with a proper photovoltaic panel surface (235 kWp) to generate and exchange electric energy with the grid was taken into consideration.
2015
Backup and safety lighting systems
Costs amortization
Dialux software
Investments
Lighting systems
PV
Road tunnels
Management
Monitoring
Policy and Law
Renewable Energy
Sustainability and the Environment
Geography
Planning and Development
3304
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12606/27409
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 11
social impact